Why trade shows need phone booths
Trade show halls are loud. Between the PA announcements, stand demos and thousands of conversations, taking a sales call or a video meeting on the show floor is close to impossible.
A soundproof phone booth gives exhibitors and visitors somewhere quiet to close a deal, join a Teams call or simply step away from the noise for ten minutes. For organisers, booths in a lounge or networking area add real value for attendees. They can also be branded and sold as a sponsorship opportunity.
The hard part isn’t deciding you want booths. It’s getting them to the right hall, powered up and ready before the doors open. This checklist walks you through what to sort out, and when, whether you’re an exhibitor booking one booth for your stand or an organiser placing several across a venue.
1. Lead times: book earlier than you think
Book your booths at least 5 weeks before the show. Busy months for UK exhibitions, typically spring and autumn, can see several major shows running in the same week, and booth stock is limited.
Your booth hire is only one part of the timeline. Venue deadlines for power, stand plans, and vehicle bookings often fall weeks before the event itself. Missing them usually means late fees or no power at all.
| When | What to do |
| 8–12 weeks before | Confirm how many booths you need and where they will go. Request a quote from Podrent. |
| 6–8 weeks before | Confirm your booking. Check the exhibitor manual for power, floor plan and rigging deadlines. |
| 4–6 weeks before | Order electrical sockets through the venue or official contractor. Submit your stand plan showing booth positions. |
| 2–4 weeks before | Book your delivery slot and send Podrent the venue’s delivery details and contact names. |
| Final week | Confirm the delivery time, hall and stand number, and who will be on site to receive the booths. |
These timings are a guide. Your exhibitor manual is the final word, so check its deadlines first and work backwards.
2. Venue power: order it, don’t assume it
Each booth needs a standard 13A socket, one per booth to run its ventilation fan and lighting. Without power, a soundproof booth quickly becomes stuffy and dark, which defeats the purpose.
At most UK exhibition venues, power is not included with your stand space. It must be ordered in advance, usually through the venue’s official electrical contractor, and it is charged separately. Ordering on the day is often possible but costs considerably more.
When you order power:
- Order one socket per booth, positioned close to where each booth will stand.
- Mark socket positions clearly on your stand plan so the contractor installs them in the right place.
- Check whether power is live during build-up, or only from the morning of the show. You may want to test the booths the day before.
- Ask whether cables can run under flooring or carpet, so there is no trip hazard at the booth door.
For organisers placing booths in public areas such as lounges or registration, speak to the venue’s event manager early. Power in foyers and walkways can be harder to arrange than on the show floor.
3. Delivery slots and access
Large venues control every vehicle that arrives during build-up. Most run a booking or marshalling system, where vehicles queue at a holding area and are called forward to the loading bays in turn. Turning up without a booked slot can mean a long wait or being turned away.
To keep delivery smooth:
- Book a delivery slot through the venue’s vehicle booking system, or ask your stand builder or organiser whether they book slots on your behalf.
- Send Podrent the hall number, stand number, slot time and an on-site contact name and mobile number.
- Check the route from the loading bay to your stand. Booths arrive flat-packed on pallets, but note any narrow doors, lifts or mezzanine levels.
- Allow for forklift or pallet truck access if your stand is far from the loading doors. Some venues require you to book this through their contractors.
- Make sure someone is on site to sign for the delivery and show the team where each booth goes.
If your booths are going into a hall that’s being built at the same time as hundreds of other stands, an early slot is worth asking for. Aisles get more crowded as build-up goes on.
4. Build-up and breakdown
A single booth takes our team around 70 minutes to assemble, and a meeting pod around 120-150.
Our installers build, level and test every booth on site, so you don’t need to lift a finger.
During build-up, plan for the booths to go in after your flooring is laid but before final dressing of the stand. Booths placed too early can get in the way of carpet fitters and stand builders. Placed too late, they may not get power tested before the doors open.
Before the show opens, check that:
- Each booth is powered, with the fan and light working.
- Doors open and close fully and nothing blocks the entrance.
- Any branding, signage or booking system is in place.
- The booths are positioned where visitors can see them, but away from the loudest speakers and demo areas.
During breakdown, the first hour after a show closes is usually crowded and chaotic. Most venues only allow vehicles back onto the loading bays once aisles are clear. Agree a collection time with Podrent in advance, and make sure someone from your team stays until the booths are dismantled and collected. Leave power connected until the team arrives, so the booths can be checked before they’re packed away.
5. Notes for major UK venues
Every venue has its own rules, and they change between shows. Always check the exhibitor manual for your event. These notes cover what to think about at four of the UK’s busiest venues.
ExCeL London. A very large venue in east London’s Docklands, with halls stretching along one long building. Find out which end of the venue your hall is nearest to, as the walk from the wrong loading bay is long. Vehicle access is tightly managed during build-up, so book your slot early.
NEC Birmingham. One of the UK’s largest exhibition centres, with many interconnected halls beside Birmingham International station and the airport. With several shows often building at once, confirm your hall number and loading door with care, and allow time for marshalling.
Olympia London. A historic venue in Kensington, west London, on a tighter urban site than the purpose-built centres. Delivery windows and loading space can be more limited, so share exact timings with your supplier and check for any restrictions on vehicle size.
Manchester Central. A city-centre venue in a converted former railway station, used for conferences as well as exhibitions. Booths here are often placed in breakout or networking spaces rather than on a show floor, so check power and access for the specific room you’re using.
Hiring for one of these venues? Contact us with your show name and dates, and we’ll check availability for you.
Editor’s note: each venue paragraph can be expanded into its own page, such as “Phone booth hire at ExCeL London”. Add details from Podrent’s own experience at each venue to make these pages stronger than competitors’.
Your trade show phone booth checklist
Print this out or save it for your next show.
- Decide how many booths you need and where they will go
- Request a quote and confirm your booking
- Read the exhibitor manual and note every deadline
- Order one power socket per booth through the venue’s contractor
- Mark booth and socket positions on your stand plan
- Book a delivery slot and share it with Podrent
- Send hall number, stand number and an on-site contact
- Check the route from loading bay to stand
- Test power, fans, lights and doors before the show opens
- Agree a collection time for breakdown
- Keep power on until the booths are collected
Book phone booths for your next show
Podrent supplies Silen soundproof phone booths and meeting pods for exhibitions, conferences and events across the UK. We handle delivery, installation and collection, and we work with exhibitors, organisers and stand builders alike.
Tell us your show name, venue and dates, and we’ll confirm availability and send a quote within 24 hours.